The project for investing in the construction of the road connecting DT.261 to DT.266.

On December 20, 2023, Bach Dang Construction Corporation – Joint Stock Company signed a construction contract (Phase 1) for the Construction of the road connecting DT.261 to DT.266 project, with a total value exceeding 92 billion VND. The project is located in Pho Yen City and Phu Binh District, Thai Nguyen Province, and is under the management of the Project Management Board for the Investment and Construction of Provincial Transportation [...]

Read more...

Road Construction Project Phuoc Hoa – Hoa Khuong, Hoa Vang district, Da Nang city

Bid Pack 3.5 – Road construction Phuoc Hoa – Hoa Khuong sustainable development projects Danang People’s Committee of Da Nang city to be investor. Hoa Phuoc road works – Hoa Khuong starting point (Km 0 + 000) road linking the southern interchange, the national highway 1A – Hoa Quy (1A for the Km939 + 563) The Christmas Village, Phuoc Hoa commune; endpoint (Km7 + 768.11) Go Ha village, Hoa Khuong [...]

Read more...

Tender packages A3 – Project rainwater drainage, wastewater and solid waste management in Hai Phong, phase 1.

Package size: Building construction 04 sewage pumping stations: Kieu Son, Lach Tray, An Da, Market Goods. A3 bidding package worth 117.9 billion in the 30 months construction A3 bidding package – Investment in construction Component Component drainage and sewage drainage of rainwater drainage projects, wastewater and solid waste management in Hai Phong, Phase I Project by Hai Phong City People’s Committee investor. Funding for projects from ODA loans of the [...]

Read more...

Project construction highway Noi Bai – Lao Cai.

Construction package A6 (a tender for the construction of eight projects the Noi Bai – Lao Cai) is the ramp going through Van Yen District, Yen Bai Province has a total length of 40km (Km159 to Km199 from). Phase 1 of the approved bid package with roadbed width 24m with 4 lanes, 2 emergency stopping lane, separators, safety and curb strips. Highway projects in Lao Cai Noi Bai-first point is [...]

Read more...

Package A1 – Project rainwater drainage, wastewater and solid waste management in Hai Phong, Phase 1

Package sizes: construction of two interceptor sewers / pressure wastewater collection and transfer m to Market Goods stations and a sewer pressure line from the pump station transport cargo to the wastewater treatment plant in Vinh Niem, how including concrete gravity sewer DN800: 740m, DN1000: 313,5m; HDPE pressure sewer DN1000: 2.635m, DN630: 542m; cast iron drain pipe pressure DN1200mm: 2.147m. Package A1 contract worth nearly 367 billion in the [...]

Read more...

Highway 18

Score from Hanoi (highway intersects with North Thang Long – Noi Bai); Mui Ngoc endpoint, TP. Mong Cai, Quang Ninh (KM98 – Highway 4B). Journey: Highway 18 passes through Soc Son, Bac Ninh city, town Chi Linh, Yen Hung district, Uong Bi City Halong City, Cam Pha Town, Tien Yen, Dam Ha, Hai Ha and Mong Cai City. Technical condition: Clips from Noi Bai to Bac Ninh city is also known as the Noi [...]

Read more...

Path Binh Bridge – Hai Phong

Bridge 1280 meters in length, 22.5 meters wide, four-lane and two-lane motor rudimentary navigational clearance height of 25 meters allowing ships of 3,000 tons over again, structural steel beams combines concrete, continuous 17 beats, the towers of reinforced concrete 101.6 m in height. The bridge is designed to shape the curve and aesthetic architecture, two bridge path is 1 urban road. Binh bridge is built to ferry Binh 1,300 meters, [...]

Read more...

National Convention Centre

Due to the need to have a conference center which is equal to the national position, NCC Construction has been started on 11.15.2004 and finished the day in the 22-month period. Supplier is considered one of the three largest conference center in Southeast Asia today. As the first and only center of Vietnam is based on advanced technologies and the most modern today, NCC is considered a key project of [...]

Read more...