TYPICAL PROJECT
Tender packages A3 – Project rainwater drainage, wastewater and solid waste management in Hai Phong, phase 1.
Package size: Building construction 04 sewage pumping stations: Kieu Son, Lach Tray, An Da, Market [...]
10 Các bình luận
Th7
Project construction highway Noi Bai – Lao Cai.
Construction package A6 (a tender for the construction of eight projects the Noi Bai – [...]
1 Các bình luận
Th7
Package A1 – Project rainwater drainage, wastewater and solid waste management in Hai Phong, Phase 1
Package sizes: construction of two interceptor sewers / pressure wastewater collection and transfer m to [...]
466 Các bình luận
Th7
Mong Duong Thermal Power Plant 1
Fuel plants using coal, thermal power technology traditional condensing, access critical steam parameters, coal fired [...]
9 Các bình luận
Th7
Project commercial residential gateway 266 Tran Nguyen Han, Le Chan, Hai Phong.
Overall project perspective The project was built on land with an area of 3714.3 m2 [...]
8 Các bình luận
Th5
Construction Project printer factory in Bac Ninh Canon laser
Factory production of laser printers Canon Inc. Capacity of 8.4 million units / year, located [...]
462 Các bình luận
Th11
Investment project to build areas of eco-tourism and weekend holiday in Soc Son, Ha Noi
The total area of project is 191 hectares. Total estimated investment capital is that 650 [...]
15 Các bình luận
Th7
Complex Buildings of Commercial Services and Housing in Nguyen Chanh St.
Project land area of 1300 m2, total investment is 250 billion VND in which the [...]
473 Các bình luận
Th7
Establishment Van Loc Investment Joint Stock Company
Van Loc Investment J.S Co. was established by three founded shareholders is Bach Dang Construction [...]
1 Các bình luận
Th7
Apartment area at No. 97 Bach Dang
The infrastructure, housing and villas in this New Urban Area have been completed and being [...]
537 Các bình luận
Th7