Tender packages A3 – Project rainwater drainage, wastewater and solid waste management in Hai Phong, phase 1.

Package size: Building construction 04 sewage pumping stations: Kieu Son, Lach Tray, An Da, Market Goods. A3 bidding package worth 117.9 billion in the 30 months construction A3 bidding package – Investment in construction Component Component drainage and sewage drainage of rainwater drainage projects, wastewater and solid waste management in Hai Phong, Phase I Project by Hai Phong City People’s Committee investor. Funding for projects from ODA loans of the [...]

Read more...

Project construction highway Noi Bai – Lao Cai.

Construction package A6 (a tender for the construction of eight projects the Noi Bai – Lao Cai) is the ramp going through Van Yen District, Yen Bai Province has a total length of 40km (Km159 to Km199 from). Phase 1 of the approved bid package with roadbed width 24m with 4 lanes, 2 emergency stopping lane, separators, safety and curb strips. Highway projects in Lao Cai Noi Bai-first point is [...]

Read more...

Package A1 – Project rainwater drainage, wastewater and solid waste management in Hai Phong, Phase 1

Package sizes: construction of two interceptor sewers / pressure wastewater collection and transfer m to Market Goods stations and a sewer pressure line from the pump station transport cargo to the wastewater treatment plant in Vinh Niem, how including concrete gravity sewer DN800: 740m, DN1000: 313,5m; HDPE pressure sewer DN1000: 2.635m, DN630: 542m; cast iron drain pipe pressure DN1200mm: 2.147m. Package A1 contract worth nearly 367 billion in the [...]

Read more...

Mong Duong Thermal Power Plant 1

Fuel plants using coal, thermal power technology traditional condensing, access critical steam parameters, coal fired boiler technology fluidized bed (CFB) modern, consistent with the type of low-quality coal Antracite Vietnam’s major coal mines in Quang Ninh. Demand for coal for the Mong Duong thermal power plant 1 about 3 million tons of coal / year. Under the plan, unit 1 will be completed and put into commercial operation in [...]

Read more...

Project commercial residential gateway 266 Tran Nguyen Han, Le Chan, Hai Phong.

Overall project perspective The project was built on land with an area of 3714.3 m2 hectares at 266 Tran Nguyen Han alley, Le Chan District, Hai Phong city with 27 houses including villas and town houses on a land plot 2371 , 37 m2; total floor area approximately 11 850 m2; Land transport: 1231.63 m2; Green land: 111.30 m2. – To the northwest ditch Kim Hai route – North-east neighborhoods – Southeast neighborhoods [...]

Read more...

Investment project to build areas of eco-tourism and weekend holiday in Soc Son, Ha Noi

The total area of project is 191 hectares. Total estimated investment capital is that 650 billion VND, in which the investment value in 2010 is 5 billion VND, invest in building areas of eco-tourism and weekend holidays in Minh Tan hamlet, Minh Tri commune, Soc Son district, Hanoi. The project will be constructed and surrounded by low mountain ranges in Soc Son overlooking Dong Do lake.

Read more...