Commencement of Quan Trieu Cement Plant

GroundbreakingCeremony of Quan Trieu Cement Plant Take part in themeeting has representative of leaders of Thai Nguyen province and Thai Nguyencity, China Embassy in Vietnam,Vietnam Coal and Mineral Corporation and Contractors. The Employer is QuanTrieu cement J.S Company – VVMI – Viet Bac Industrial Mine Company. The totalamount of Project is USD 67,63 million, construction time is 24 months.

Read more...

Bim Son Cement Plant Project (Stage II)

Bach DangConstruction Corporation request all of the sub-contracts (subsidiaries companyas: Construction J.S company No. 203, Machinery & Construction J.S CompanyTMC, Ha Noi Investment & Construction J.S Company), which are participatedin construction must concentrate manpower and equipment to shorten constructiontime, complete and hand-over project to the Employer in December 2008.

Read more...

Construction high building: Tran Hong Quan High building – My Dinh

The project islocated at Lot X7 belong to High class athlete training centre at Le Duc ThoRoad, My Dinh, Tu Liem, Ha Noi. The construction work begin at 03/09/2008 and shall finish after 08months. CROWN PLAZA COMPLEX OFFICE BLOCK Range of project:–    Floor area: 47×17,44 = 820(m)–    Number of store: 25 –    Structure: RC frame APARTMENT BLOCK Range of project:–    Floor area: 47×17 = 799(m)–    Number of store: 18 –    Structure: RC frame

Read more...

Bach Dang 8 Investment & Construction Joint Stock Company

– Name in short: Bach Dang 8– Add.: P303, Building D5-C, Nguyen Phong Sac Road (Extension), Dich Vong Ward, Cau Giay Dist., Hanoi City, Vietnam.– Tel.: 042 690 599– Fax: 042 690 595– E-mail: bachdang8@yahoo.com Main activities – Exploit and process mineral resources (excluding which are forbidden by Vietnam State);– Manufacture and make business on construction material;– Leasing warehouse, stockyard, workshop, machinery, means of transportation;– Mechanical process, equipment/ machinery repair;– Make [...]

Read more...

Construction of Vung Ang 1 Thermal-Power Plant

Bach DangConstruction Corporation performs some main works of this EPC Contract (Design,Equipment Supply, Installation, construction, test commissioning, TechnologyTransfer) of the Project. The scope of workconsists of Coal and Oil supply systems; Storage for fuel and materials; powerdistribution station; and some other Works with the total estimated value of 700bil. VND. The package EPC proposed tobe started in early September, 2009 andcompleted after 42 months. Uong Bi thermalpower Plant – 600MW capacity [...]

Read more...

National Highway No. 21.2 Improvement Project

Up to this time,the preparation works as establish Project management unit; Mobilizationconstruction equipment; Make the detail construction schedule of each line tosubmit to the Employer has completed. Some lines of project have hand-over fromEmployer. The Project is in process of road-bed construction. Construction road-bed