Construction works of package NT-1.5b – Coastal Cities Environmental Sanitation Project- Nha Trang City sub-project.

At this moment, several items are urgently carried out by Bach Dang Construction Corporation: Execution of  2mx3m box culverts with a total length of 1742m; Execution of D800, 1000 , 1200, 1500, 2000 1800 pipe culverts with a total length of 1800m; HDPE pressure sewer system D300-D400: 1690m, uPVC D200: 970m.

The items of the project are being constructed  

 


 

 2m x 3m Box culvert system
 
 

D1200 pipe culvert system