National Highway No. 21.2 Improvement Project

Up to this time,the preparation works as establish Project management unit; Mobilizationconstruction equipment; Make the detail construction schedule of each line tosubmit to the Employer has completed. Some lines of project have hand-over fromEmployer. The Project is in process of road-bed construction. Construction road-bed

Read more...

Bach Dang 7 Joint Stock Company

– Name in short: Bach Dang 7– Add.: Zone 6, Quan Tru Ward, Kien An District, Hai Phong City, Vietnam.– Tel.: 0313 576 215– Fax: 0313 576 020– E-mail: bachdang7@vnn.vn Main activities – Manufacturing and making business on construction materials;– Construction of industrial, civil, infrastructure, irrigation, industrial zone, shipyard,  wharf, power line, power station, airport, …– Investment and Construction consultant;– Making business on developing housing, hotel, restaurant, tourism;– Transportation onshore and [...]

Read more...

Resident Area Gai

Project Area: 132,248 m2Location : in the Central of Nui Deo townlet, Thuy Nguyen district, Hai Phong city (8 km from the central of Haiphong City). As proposed the infrastructure will be filling work, road work, water supply, drainage, power lines, lighting. There will be 145 independent villas with total 43,800m2 and 104 city houses with total 18,207m2; there will be a green area and sport area in the central [...]

Read more...

Construction of PVFC branch’s office in Hai Phong

Ground BreakingCeremony of PVFC branch in Hai Phong On the 4th July 20029,PVFC branch’s office in Hai Phong built on the area of 1100m2, the buildingwith total floor area is 130.000m2, including 19 floors, and a basement, anddesigned with distinctive architecture, anti-sunlight glass used and the energysave. The project was owned by Viet Nampetroleum Finance & Land joint-stock Corporation, with total investmentCapital 193 bil.VND. It will be completed and used [...]

Read more...

Bach Dang Investment Industry Construction Hanoi Joint Stock Company

– Add.: P1602 – 71 Ngyen Chi Thanh St., Dong Da Dist., Hanoi, Vietnam.– Tel.: 045 752 596– Fax: 045 752 596 Main activities: – Invest and construct hydropower plant, thermal power plant, cement plant;– Construction of power line and station upto 35KV;– Foundation treatment for construction project and observe & measure (meteorological phenomena);– Manufacture, make business , lease, install, repair, maintain construction materials, equipment, machineries;– Agent for ods storage and [...]

Read more...

Bach Dang 6 Investment & Construction Joint Stock Company

Name in short: Bach Dang 6– Add.: Number 21.2, 21th Floors, CT3 VIMEXCO Building, Trung Hoa, Cau Giay Dist., Hanoi, Vietnam.– Tel.: 04 22250306– Fax: 04 22250307– E-mail: bdcc-hanoi@viettel.vn Main activities Bach Dang 6 is pround of its performance in construction of industrial, civil, building, infrastructure construction with modern construction equipment imported from developed countries as USA, Japan, Germany, Korea,… and 455 experienced engineers, skillful workers and staffs. Professional and active, Bach [...]

Read more...

Multipurpose buildings project in Tran Phu St., Ha Dong Dist., Ha Noi City

Currently, the citizen’s demand for apartments in Ha Dong district are increasing, and is expected to continue to increase in the coming years. Besides, people’s income increased significantly in the recent years, demands for shopping increased, ing shopping at the shopping centers, supermarkets have become routine for many people. Through the research, know the market, understand the needs of public housing and commercial centers is growing, Ha Tay Joint [...]

Read more...

Preliminary Meeting of the Production and Business Activities of the earlier six months and tasks of the final six months of 2009

Mr. Nguyen Tran Nam– member of Party civil affairs committee, Vice Minister of ConstructionMinistry; Mr. Nguyen Van Thanh – member of City Committee of the Party – VicePresident of Hai Phong city people’s Committee attended and made speeches atthe meeting. Mr. Nguyen TienThanh – General Director reported the reached results of the earlier sixmonths, plan to implement tasks of the final six months of 2009. Result of earlier6 months: business production [...]

Read more...

National Highway No. 38B Improvement Project

This projectshall be implementing by Joint Operation Bach Dang Construction Corporation – TransportConstruction and Investment Trading Joint Stock Company.  Bach Dang Construction Corporation assignedthis project to Bach Dang Joint Stock Company no.6. Some lines of project havehand-over from Employer. The Project is in process of road-bed construction. Construction road-bed

Read more...

Quang Ninh Water Drainage Project

The project hascompleted and hand-over to the Employer. The Employer and Quang Ninh PeopleCommittee are highly appreciated the endeavor of construction unit to ensurethe construction schedule in the difficult construction site conditions and thefluctuation of material price.