Construction of Vung Ang 1 Thermal-Power Plant

Vung Ang 1 Thermal Power Project has 2 plant Units with capacity 1200 MW, which is built in Hai Phong hamlet, Ky Loi commune, Ky Anh district, Ha Tinh province and owned by Viet Nam petroleum Group. Total investment capital is about 1.250 mil.USD.

Bach Dang
Construction Corporation performs some main works of this EPC Contract (Design,
Equipment Supply, Installation, construction, test commissioning, Technology
Transfer) of the Project.

The scope of work
consists of Coal and Oil supply systems; Storage for fuel and materials; power
distribution station; and some other Works with the total estimated value of 700
bil. VND. The package EPC proposed tobe started in early September, 2009 and
completed after 42 months.


Uong Bi thermal
power Plant – 600MW capacity Built by Bach
Dang Construction Corporation (2003 – 2007)

18 những suy nghĩ trên “Construction of Vung Ang 1 Thermal-Power Plant

  1. bokep viral nói:

    Hi there just wanted to give you a brief heads up and let you know a few of the images aren’t loading correctly.I’m not sure why but I think its a linking issue. I’ve tried it in two different browsers and both show the same outcome.

  2. 派傳單 nói:

    I do agree with all of the ideas you’ve presented in your post. They are very convincing and will definitely work. Still, the posts are very short for novices. Could you please extend them a little from next time? Thanks for the post.

  3. tour sieu re nói:

    Oh my goodness! Amazing article dude! Thanks, However I am experiencing issues with your RSS. I donít know why I cannot join it. Is there anyone else getting identical RSS issues? Anyone who knows the answer will you kindly respond? Thanx!!

Trả lời

Email của bạn sẽ không được hiển thị công khai. Các trường bắt buộc được đánh dấu *