Residential Zone and Public Works Services 97 Bach Dang

Currently, at the project premises, technical infrastructure such as road systems, water supply and drainage system, power supply system, lighting …, cottages and villas complete transplant walking households into operation.

68

Under the plan being implemented, on the ground floor area of 4,720 m2 will build the twin towers with 11 floors and 01 scale basement garage for automobiles, motorcycles, bicycles for both the supermarket, apartments in low-rise housing and around. The apartment buildings are expected at this 11-storey twin towers of about 75 m2 and 100 m2 and 145 m2 / apartments with modern amenities standard, independent, self-contained and uniform. To increase the attractiveness of residential areas in the project area in the center layout built two public works is kind of recreation pool and two tennis courts.

SOME ITEMS ARE CONDUCTING UNDER OPTION

Total investment: 81.056 billion VND
Scope of project
Condominium combined supermarket
– Lot area: 4,720 m2
– Construction area: 2,580 m2
– Number of floors: 2 × 11 floors
– The total construction floor area: 23,478 m2
Pool
– Lot Size: 2.960 m2
– Build the operator: 450 m2
– DT construction executive floor: 900 m2
– Build pools: 1,300 m2
Tennis course
– Lot area: 1,900 m2
– Build the operator: 120 m2

To catch up with the trend of industrialization and modernization, and improve conditions for people living environment, contributing to the improvement of the urban architecture of the city of Haiphong, the Corporation Bach Dang Construction ongoing Haiphong please raise the scale of the project and apartment buildings up service from 25 to 30 floors with total investment estimated at about 500 billion.