Bach Dang Construction Corporation finished concreting the bracket for generator and turbine in Power Station 1 – Thermal power factory Thai Binh 1

On 24th Nov, 2015, Bach Dang Construction Corporation (BDCC) finished concreting the bracket for generator and turbine in Power Station 1 (Thermal power Thai Binh 1) as planned, meeting the most demands of quality, art-techniques, and safety.

Turbine house 1

The bracket for generator and turbine runs the most important item to the heart of the Thermal power factory. The construction process asks the Contractor to meet high and quite strict demands of construction techniques and methods.

– The bracket for generator and turbine in Power station 1 – Thermal power factory Thai Binh 1 with the size up to 3.5m high, 3m wide, 40m long, laid on the height of 14m and supported by pillars of 3x3m.
Volume of construction:
+ Concrete: 850 m3
+ Iron: 120 ton
+ Formwork: 400m2
To reach the high accuracy as the item especially requests, the bracket for generator and turbine is under construction of the latest PERI formwork technique and Nikken propping.



Work on labor safety to all staffs at site before the construction work starts

Deploy concreting the bracket for generator and turbine in Power station 1

With nearly 60-year experience working in construction industry, especially in building cement factories and the staff of good engineers and skilled workers who experienced many national great and main projects, BDCC brilliantly completed the item of the bracket for generator and turbine in Power station 1 on schedule, meeting special demands of art-techniques, ensuring quality and safety, and obtaining high appreciation from Investor, General contractor, and Supervising consultancy.