Construction Progress of package 11D – 03 Blocks of 5 storeys – Quang Ninh Thermal Power Plant Project.

Bach Dang Construction Corporation is the contractor of Package 11D – 03 Blocks of 5 storeys – Quang Ninh Thermal Power Plant Project. The contract is worth 142 billion invested by Quang Ninh Thermal Joint Stock Company. Construction Management Department of the Corporation, Bach Dang 7 Construction Joint Stock Company and Bach Dang 15 Development and Investment Construction Joint Stock Company were required to cooperate with the Owner to concentrate on construction for early completion of the rest work to hand-over to the Owner.
Bach Dang Construction Corporation is the contractor of Package 11D – 03 Blocks of 5 storeys – Quang Ninh Thermal Power Plant Project. The contract is worth 142 billion invested by Quang Ninh Thermal Joint Stock Company.  Construction Management Department of the Corporation, Bach Dang 7 Construction Joint Stock Company and Bach Dang 15 Development and Investment Construction Joint Stock Company were required to cooperate with the Owner to concentrate on construction for early completion of the rest work to hand-over to the Owner.

 

Overall perspective of the project

Some images of package 11D – Quang Ninh Thermal Power Plant Project:

3 những suy nghĩ trên “Construction Progress of package 11D – 03 Blocks of 5 storeys – Quang Ninh Thermal Power Plant Project.

  1. PG Soft คืออะไร nói:

    392404 471476Good post. I be taught one thing more challenging on entirely different blogs everyday. It will all the time be stimulating to learn content from other writers and apply slightly one thing from their store. Id desire to use some with the content on my blog whether you dont mind. Natually Ill give you a hyperlink on your net blog. Thanks for sharing. 256969

Trả lời

Email của bạn sẽ không được hiển thị công khai. Các trường bắt buộc được đánh dấu *