La Hien Cement Plant Project

At thepreparation stage, the Contractor has met many obstacles due to the changed indesign drawing of Employer and the fluctuation price of material. At this timewith the cooperation and assistance of Employer the project are continuouslyimplement with the construction progress satisfy the requirement of project.