Vung Ang Thermal Power Plant 1

Corporation Bach Dang Construction undertake some major items in the EPC contract (Design, supply of equipment, installation, construction, commissioning, technology transfer) project. The scope of work includes supply system of coal, oil level; Fuel depots, supplies; Power distribution stations and some other items with a total value estimated at around 700 billion. EPC package is expected to start in early 9/2009 and complete after 42 months.