Bach DangConstruction Corporation performs some main works of this EPC Contract (Design,Equipment Supply, Installation, construction, test commissioning, TechnologyTransfer) of the Project.
The scope of workconsists of Coal and Oil supply systems; Storage for fuel and materials; powerdistribution station; and some other Works with the total estimated value of 700bil. VND. The package EPC proposed tobe started in early September, 2009 andcompleted after 42 months.

Uong Bi thermalpower Plant – 600MW capacity Built by BachDang Construction Corporation (2003 – 2007)

930651 303124Im so pleased to read this. This really is the kind of manual that needs to be given and not the accidental misinformation thats at the other blogs. Appreciate your sharing this greatest doc. 202298
881651 472408I agree completely with what you said. Fantastic Stuff. Keep it going.. 17585
198093 257855An attention-grabbing dialogue is value comment. I believe that you want to write a lot more on this matter, it wont be a taboo topic nevertheless generally individuals are not sufficient to speak on such topics. Towards the next. Cheers 871303