Uong Bi Thermal Power Plant – Quang Ninh
The factory was started construction on 23/5/2008, scheduled to be constructed in 36 months and [...]
212 Các bình luận
Th7
Pha Lai Thermal Power Plant 1 and 2 lines
Pha Lai power plant was built in two phases. Phase I was started to build [...]
2 Các bình luận
Th7
Factory Proconco Haiphong
Dinh Vu is the optimal choice for the introduction of fodder Factory second in the [...]
2 Các bình luận
Th7
Lach Tray Stadium
Lach Tray yard was built in 1957 from a tennis-horse (an earthen pitch sidelines of [...]
4 Các bình luận
Th7
Vung Ang Thermal Power Plant 1
Corporation Bach Dang Construction undertake some major items in the EPC contract (Design, supply of [...]
3 Các bình luận
Th7
Factory production of electronic components Sumidenso
Plant under a limited liability company Sumidenso Vietnam, with a total investment of 20 million [...]
Th7
Hai Phong Cement Factory
Hai Phong Cement with brand “Dragon” in traditional long been deep in the subconscious of [...]
751 Các bình luận
Th7
Fodder factory in Hai Duong ANT1
Most of Vietnam’s market for imported commodities 1/2010 increased over the same period in 2009. [...]
Th7
Linh Dam Condo
Even now in the country has thousands of urban areas (urban area), the Linh Dam [...]
Th7
Hoang Thach Cement Factory lines 1, 2 & 3
To date the Company has constructed 90% of the volume of work and has handed [...]
1 Các bình luận
Th7