TYPICAL PROJECT
Box Culvert construction – Drainage DA Da Nang
Scale works: – Dig ditches, intubation, 10,000 road construction – Supply and installation of cast [...]
784 Các bình luận
Th7
National Convention Centre
Due to the need to have a conference center which is equal to the national [...]
2 Các bình luận
Th7
Big C Hai Phong Super Market.
Big C Hai Phong was designed and built in an area of 10.365m2, with 2 [...]
Th7
Masuoka Vietnam Factory – Nomura industrial zone – HP
The company will manufacture and assembly of plastic products serve the automotive industry, motorcycles, electrical, [...]
1 Các bình luận
Th7
Uong Bi Thermal Power Plant – Quang Ninh
The factory was started construction on 23/5/2008, scheduled to be constructed in 36 months and [...]
3 Các bình luận
Th7
Pha Lai Thermal Power Plant 1 and 2 lines
Pha Lai power plant was built in two phases. Phase I was started to build [...]
1 Các bình luận
Th7
Factory Proconco Haiphong
Dinh Vu is the optimal choice for the introduction of fodder Factory second in the [...]
1 Các bình luận
Th7
Lach Tray Stadium
Lach Tray yard was built in 1957 from a tennis-horse (an earthen pitch sidelines of [...]
3 Các bình luận
Th7
Vung Ang Thermal Power Plant 1
Corporation Bach Dang Construction undertake some major items in the EPC contract (Design, supply of [...]
1 Các bình luận
Th7
Factory production of electronic components Sumidenso
Plant under a limited liability company Sumidenso Vietnam, with a total investment of 20 million [...]
Th7